SENIOR PLANNER-SCHEDULER/PROJECT CONTROLS ENGINEER - DUTIES AND RESPONSIBILITIES:
PRIMARY FUNCTION: The Planner-Scheduler/Project Controls Engineer assigned to the project is responsible for the validity of the Contractor’s and the Company’s execution plans, schedules, and time control activities. Activity will extend from the basic engineering phase, through detailed engineering, procurement, construction and start-up.
DUTIES AND RESPONSIBILITIES: Specifically, these responsibilities, with respect to time management, include:
Ensuring that the Project is executed utilizing the total project scheduling effort for the optimum strategy to achieve overall project objectives.
Reviewing the Contractor’s scheduling to ensure that it includes appropriate definition, content and extent of time control coverage; establishing of scheduling format, overall coordination, maintenance, analysis, reporting presentation and frequency.
Ensure that no work is performed under the contract in advance of the preparation and approval of well-defined plans, schedules and manpower requirements.
Seeing that the plans and schedules are supported by integrated logic network diagrams developed utilizing demonstrated planning techniques.
Ensuring that the required plans are reviewed and agreed to by The Company’s Project Manager prior to issue, that the Contractor and The Company interfaces are defined and that the entire work is coordinated.
Monitoring The Company’s and Contractor's planning and scheduling organization, staffing and key personnel.
Guiding the regularly scheduled, formal quarterly reviews designed to define current progress status and to demonstrate effectiveness of the time control system.
Ensuring that the PMT maintains progress curves (planned vs. actual performance) for each engineering discipline, for each field craft and for each subcontractor by unit or area of work.
Seeing that the Contractor’s Field Productivity Data is prepared on a timely basis and gives The Company’s Project Team access to such data.
Developing a format for and assisting in preparation of schedule for offsites and utilities work performed by The Company. Assist in developing guidelines for reporting and control.
Seeing that the special requirements for Shutdown Schedules, including Sequence of Completions, are met by assisting the Shutdown Coordinator and Start-up Coordinator.
Monitoring the participants to ensure that Shutdown Schedule Reporting begins as soon as The Company has agreed to a detailed plan and schedule, and that the current master copy mark-up of the Shutdown Plan and Schedule is maintained.
* 10+ YEARS - OVERALL EXPERIENCE IN THE FIELD OF PETROCHEMICAL, CHEMICAL, AND POWER INDUSTRY.
* EXPERIENCE WITH “PRIMAVERA” AND/OR “MICROSOFT PROJECT” - A PLUS
*Excellent Compensation Pkg. -- Compensation is competitive & negotiable based upon experience in the field. REPLY TO: (972) 238-5284 www.thenicholasgroup.net